HFSP Labs — RWA Launchpad (Genesis Grid first product)
HFSP Labs
HFSP Labs
Genesis Grid — infrastructure + verification
Pre‑seed raise live

The tokenization platform for Bitcoin mining & AI data centers.

HFSP Labs structures and launches compliant, verifiable RWAs backed by real compute infrastructure—starting with Genesis Grid (2MW → 6MW Paraguay) plus live proof and reporting via OGPool. We do not present guaranteed returns — we execute infrastructure and report outcomes transparently.

Target tariff
$0.056 / kWh
Guarantee deposit
$94,000
Initial CAPEX (scope)
~$839,590

Market (TAM) — tokenization / RWAs

We’re early in a multi‑trillion‑dollar shift: moving real assets on‑chain with compliant rails.

  • Tokenized digital securities: Citi GPS estimates ~$4–$5T by 2030 (mid‑range framing).
  • Broader asset tokenization: BCG‑linked estimates often cite ~$16T by 2030 (conservative case).
  • Our wedge: start with verifiable mining / AI‑compute infrastructure where cashflows can be measured and audited.
Third‑party market estimates (directional, not guarantees). Sources: Citi GPS (summary) · BCG/ADDX tokenization report.

Target returns (illustrative, not guaranteed)

  • Modeled annualized IRR (base case): ~94% / year (from the provided assumptions spreadsheet; highly sensitive to BTC price, network difficulty/hashprice, uptime, capex/opex, and execution).
  • Under the same base‑case assumptions, a 12% stake could map to ~$5.37M of value by 2031 (illustrative; also sensitive to reinvestment and dilution).
Illustrative projections only. Actual outcomes depend on market and operational variables (BTC price, network difficulty/hashprice, uptime, capex/opex, execution). We can share a bull/base/bear sensitivity view on request.

Roadmap (launchpad → Genesis Grid → STO)

  • Now: Launchpad MVP live (OGPool) + counsel‑ready structure
  • 0–30 days after funding: electrical provider binding steps (deposit + execution), procurement kickoff
  • 30–100 days: 2MW deployment + dashboard/reporting cadence live
  • 100–180 days: scale toward 6MW + prepare STO track (data room, KPI history, audits as needed)
  • STO readiness: issuance follows proof + regulatory approvals (milestone‑based)

Inbound STO interest (indicative)

  • A datacenter‑focused fund has expressed interest in participating in the STO track, with up to $8M earmarked (non‑binding; subject to diligence, structure, and approvals).
  • Sequencing: execute Genesis Grid + reporting first, then proceed with STO issuance milestones.
We can share details under NDA.

The wedge

Mining exposure is capital‑intensive and often opaque. Genesis Grid makes it verifiable and repeatable.

  • Infrastructure execution: power, interconnect, site build, commissioning
  • Verification layer: production + treasury visibility, uptime, reporting pack
  • Launchpad: tokenization + issuance rails once operations + data are proven

Power & interconnect

  • Target tariff: $0.056/kWh (5‑year term)
  • Guarantee deposit: $94k
  • Feasibility path includes an exclusive 23kV feeder (per electrical provider feasibility docs)
Feasibility ≠ executed contract. This raise funds the binding steps and delivery milestones.

Launchpad architecture (MVP — live today)

HFSP’s launchpad starts with verifiability: data → proof → reporting. The MVP is live. Demo available on request.

  • Data layer: miners/pool feeds + meter inputs → normalized events
  • Proof layer: signed snapshots + treasury address attestations
  • Reporting layer: KPI dashboard + monthly investor pack
  • Issuance layer (roadmap): STO‑ready structure once cashflows are proven

Tokenization structure (today → roadmap)

  • Today: operating company equity raise (this round) + verifiable reporting
  • Today: counsel‑ready tokenization structure drafted (execution follows proof + milestones)
  • Near‑term: data room + KPI cadence to support structured products
  • Roadmap: tokenized/regulated issuance referencing verified production (no guaranteed yield language)
Milestone‑based: structure follows proof. We only “turn on” issuance after operations + reporting are live.

What’s real today

  • Genesis Grid power/interconnect feasibility documentation supporting up to ~6,000 kW reserved and the interconnect path
  • CAPEX plan for initial scope totals ~$839,590
  • Staged rollout plan: 2MW first, then scale toward 6MW
  • Launchpad MVP is live (data → proof → reporting). Demo available on request.

100‑day execution plan (milestones)

Day 0–30
Deposits + binding steps, engineering approvals, procurement kickoff
Day 30–70
Site + electrical build, line works, equipment install
Day 70–100
Commissioning, bring 2MW online, dashboard live + first reporting cycle